Nicaragua “Feasibility Studies and Detailed Design”

By September 23, 2026 No Comments
Nicaragua_FS

Consulting Services for the Preparation of Feasibility Studies and Detailed Designs Environmental Sanitation Programme for the Southern Shore of Lake Managua

Services provided

  • Phase A: Feasibility studies
  • Managua: review and update of sewerage studies; definition of WWTP extension measures
  • Ciudad Sandino: review and update of the design for WWTP extension/rehabilitation and sewerage extension
  • Ciudad Sandino: measures for future nutrient removal
  • Tipitapa: review and update of water supply and sewerage studies
  • Tipitapa: analysis of current and future water availability in the proposed aquifer
  • Tipitapa: measures for future nutrient removal
  • Phase B: Detailed designs and tender documents
  • Preparation of detailed designs
  • Tender documents for all programmes

CLIENT

ENACAL

DONOR

KfW & CABEI

DURATION

2018-2022

CONTRACT VALUE

EUR 2.9 M