The scope of the project consists of: the techno-economic feasibility study, design, and tender documents elaboration for the construction of a 400 kV transmission line and associated substations for the interconnection between Uganda and Tanzania via the Masaka-Mutukula-Kyaka-Nyakanazi-Ibadakuli.

Services provided

  • The scope of the project consists of:
  • techno-economic feasibility study for a 400 kV interconnection line
  • studies of transmission line routes and associated substations
  • preparation of preliminary cost estimates
  • definition of overhead line routes and substation configurations
  • economic and financial analysis
  • climate change assessment
  • development of project implementation plan
  • preparation of technical specifications (protection, metering, SCADA, civil works)
  • support in procurement and preparation of bidding documents

CLIENT

Eastern Africa Power Pool

DONOR

AfDB

DURATION

2022-2024

CONTRACT VALUE

EUR 0.6 M