Water

Trinidad and Tobago “Maloney Wastewater Treatment Plant”

By September 23, 2026 No Comments
Trinidad_Tobago

Consultancy Services for the Provision of Detailed Designs and Preparation of Tender Documents for the Maloney Wastewater Treatment Plant and Phase 2 Collection System.

Services provided

  • Detailed designs, drawings, bill of quantities and associated cost estimates for the wastewater treatment plant (WWTP) and wastewater collection system works
  • Related implementation schedule, technical specifications and tender documents
  • Computerized maintenance system for monitoring, controlling and maintaining the phase 2 sewerage network and the Maloney wastewater treatment plant.
  • Operations and maintenance cost projections for the facility over a five
  • (5) year period
  • Training and capacity building
  • Environmental Impact assessment
  • Economic analysis and financial studies

CLIENT

Water and Sewerage Authority (WASA)

DONOR

IDB

DURATION

2020-2022