Ethiopia_Energy_9

Reinforcement of the Transmission Network in Akaki – Debrezeit – Dukem – Modjo and Ginchi Power Transmission Project / Project Management and Construction Supervision

Services provided

  • Review of the existing tender documents / Review of bids, contract negotiations and award
  • Supervision of Contractor’s construction works for Lot 1 Transmission Lines (400 and 230 kV) and Lot 2 Substations (400 and 230 kV)
  • Review and approval of Contractor’s design and engineering drawings and documents
  • Monitoring of the implementation of the environmental, social, health and safety management plan
  • Supervision of the commissioning / Support during defect liability period
  • Specific training of Client’s staff on network planning, project management, substation and OHL design, ESIA and RAP

CLIENT

Ethiopia Electric Power Co.

DONOR

Agence Française de Développement

DURATION

2015-2018

CONTRACT VALUE

EUR 3.3 M