Reinforcement of the Transmission Network in Akaki – Debrezeit – Dukem – Modjo and Ginchi Power Transmission Project / Project Management and Construction Supervision
Services provided
- Review of the existing tender documents / Review of bids, contract negotiations and award
- Supervision of Contractor’s construction works for Lot 1 Transmission Lines (400 and 230 kV) and Lot 2 Substations (400 and 230 kV)
- Review and approval of Contractor’s design and engineering drawings and documents
- Monitoring of the implementation of the environmental, social, health and safety management plan
- Supervision of the commissioning / Support during defect liability period
- Specific training of Client’s staff on network planning, project management, substation and OHL design, ESIA and RAP
CLIENT
Ethiopia Electric Power Co.
DONOR
Agence Française de Développement
DURATION
2015-2018
CONTRACT VALUE
EUR 3.3 M