Energy

Nicaragua: Hydro FS

By December 11, 2018 No Comments

Preparation of the Master Plan for the River Basin of “Río Grande de Matagalpa” and the Upper River Basin of “Río Coco“

Services provided

  • 22 potential projects studied, ranging from 6 MW to 105 MW
  • Hydrological computerized models for both river basins
  • Preliminary solutions for each potential project, covering civil, electromechanical and grid connection designs
  • Selection of the best 10 projects, considering technical, economical and environment factors, to be studied in Phase 2 (pre-feasibility studies)

CLIENT

Empresa Nacional de Transmisión Eléctrica (ENATREL) & Ministerio de Energía y Minas (MEM)

DONOR

IDB & NDF

DURATION

2013-2017

CONTRACT VALUE

USD 3.3 M